Concrete-testing request checklist
Confirm these before a pour so pricing and attendance can be returned on the first exchange. Project professionals set the project-specific requirements and the technical interpretation of results.
Project location & jurisdiction
Job address and the authority having jurisdiction (e.g. NYC DOB).
Buyer & site contact
Who to bill, and the site contact for the day of the pour.
Planned placement date & start time
Including anticipated duration of the pour.
Plans & specification references
Applicable drawings, specs and approved mix information where relevant.
Designated laboratory (where identified)
The DOB-licensed laboratory, if the project has already designated one.
Written scope & attendance confirmation
Agreed before mobilization.
Specimen storage & transfer responsibilities
Who stores cylinders on site and who transfers them, and when.
Report recipients
Everyone who should receive the laboratory's original report.
Project professionals determine the project-specific test program and the technical interpretation of results. For NYC projects, testing is performed by a DOB-licensed laboratory, which issues the report.