Testing-plan setup
Project address, filing context, mixes, estimated quantities, test frequency, placement schedule, specifications and closeout responsibilities organized into an executable plan.
Construction Project Testing Desk · New York
Send the job number, testing schedule or specification. 516Labs structures the requirement, confirms the required provider roles, coordinates qualified capacity and tracks specimens, reports and exceptions from pre-pour planning through closeout.
Built around the project event
A laboratory name is only one dependency. The project also needs the right scope, eligible roles, field timing, specimen controls, report ownership and an escalation path when something changes.
Project address, filing context, mixes, estimated quantities, test frequency, placement schedule, specifications and closeout responsibilities organized into an executable plan.
Project-specific review of laboratory licensing, accreditation, field coverage, technician requirements, capacity and required separation between TR2 and TR3 responsibilities.
Arrival windows, site contacts, field records, cylinders, curing, pickup, receiving confirmation and break schedules coordinated with the responsible providers.
One escalation desk for late specimens, unexpected results, missing records, engineer-directed follow-up and supplemental testing.
Required reports, open items and accountable parties tracked without changing who is legally responsible for testing, inspections, professional decisions or filings.
Standardized intake, approved-provider routes and project history for owners, contractors and consultants managing multiple active sites.
NYC concrete controls
NYC DOB identifies concrete testing responsibilities through TR2 and TR3. Its current guidance says the laboratory that performs the TR3 mix design cannot perform TR2 field testing on the same project.
Review the official NYC DOB concrete testing requirements and concrete enforcement FAQ. Eligibility and role assignments are confirmed for the specific project before an award.
Four controlled handoffs
Every handoff has an accountable party and a documented acceptance point.
Provide the job number, address, testing schedule, relevant specification language, pour date and any already-retained providers.
516Labs identifies the work packages, required qualifications, role constraints, availability and commercial assumptions that still need confirmation.
The customer approves the quote and identified providers before field work, specimen movement or laboratory analysis begins.
Status stays tied to the project, including provider reports, missing items, nonconforming events and open closeout dependencies.
Construction project intake
A job number and short scope are enough to start. Do not include personal information unrelated to the project.
Active project or upcoming pour
516Labs will structure the testing path and identify the provider, role and timing confirmations required to make it executable.