Keep testing off the critical path.
Job and specification intake, required-role mapping, qualified provider coordination, field and specimen status, low-break escalation and closeout tracking.
Open the Construction Desk →
516Labs runs the coordination layer between project teams, building operators, qualified field professionals and performing laboratories—scope, provider roles, scheduling, custody, reports and exceptions in one controlled workflow.
Each desk begins with a real project or recurring compliance event and ends with provider evidence tied to that requirement.
Job and specification intake, required-role mapping, qualified provider coordination, field and specimen status, low-break escalation and closeout tracking.
Open the Construction Desk →Tower inventory, recurring sampling calendar, qualified-person and ELAP routing, custody, original reports, corrective-action evidence and open exceptions by system.
Open the Building Water Desk →Send the RFP, permit, sampling plan, specification or a plain-language description. We structure the scope and route it to qualified laboratory capacity.
516Labs maps the work, confirms required provider roles and coordinates the approved route from request through original reports and unresolved exceptions.